Ban Yan Ave
Project is owned by Tembusu Multi-Utilities Complex and the work scope is erection of 3 nos of pipe rack bridges which the longest bridge is 121.7m in length and other miscellaneous metal work, and the work site is located at Banyan Drive, Tembusu Drive and Banyan Avenue. The project was utilized a total of 730 tons of structural steel for pipe rack system.